KBFI Runway 14L/32R is closed for construction through mid-November. In a FB Post, KBFI Tower said to expect delays.
Ack! The number of times I’ve been landing with simultaneous operations on the parallel is high. This will definitely be a hassle.
KBFI Runway 14L/32R is closed for construction through mid-November. In a FB Post, KBFI Tower said to expect delays.
Ack! The number of times I’ve been landing with simultaneous operations on the parallel is high. This will definitely be a hassle.