KBFI Single Runway Until Mid-November

KBFI Runway 14L/32R is closed for construction through mid-November. In a FB Post, KBFI Tower said to expect delays.

Ack! The number of times I’ve been landing with simultaneous operations on the parallel is high. This will definitely be a hassle.